Completed concrete curb & gutter and sidewalk replacements from
Harrison Street to Golf Road
·
Re-establish
traffic control devices
·
Repair
asphalt patching as needed
·
Demobilize
equipment.
·
General
Site clean-up.
Due to the lack of a state budget agreement, all construction
projects with State/Federal funding have been instructed to suspend
construction by Friday, June 30 until a budget or other spending measure is
passed by legislators.
The Harlem Road project includes State/Federal
funding; therefore, construction is being suspended as of Friday, June
30. The Village of Glenview has taken the following actions to prepare
for the construction work suspension.
- Sidewalks and
driveways that were removed have been restored to a temporary or permanent
condition, so that travel ways and private driveways are fully accessible
during the shutdown.
- Idled
equipment and materials have been removed from the jobsite or moved to a
safe and secure location, away from the travel ways to the extent
possible.