Saturday, July 1, 2017

Work Suspended Due to IDOT Shut-Down

Work Performed, June 26th to June 30th
·         Completed concrete curb & gutter and sidewalk replacements from Harrison Street to Golf Road
·         Re-establish traffic control devices
·         Repair asphalt patching as needed
·         Demobilize equipment.
·         General Site clean-up.

Due to the lack of a state budget agreement, all construction projects with State/Federal funding have been instructed to suspend construction by Friday, June 30 until a budget or other spending measure is passed by legislators.

The Harlem Road project includes State/Federal funding; therefore, construction is being suspended as of Friday, June 30.  The Village of Glenview has taken the following actions to prepare for the construction work suspension.

  • Sidewalks and driveways that were removed have been restored to a temporary or permanent condition, so that travel ways and private driveways are fully accessible during the shutdown.
  • Idled equipment and materials have been removed from the jobsite or moved to a safe and secure location, away from the travel ways to the extent possible.
The Village of Glenview will continue to monitor the budget situation and will update you on any progress made to resolve the conflict and get the project restarted.